Pilot Kitchens: 10 Burbank kitchens, filmed start to finish, at 30% less. 10 of 10 open.
HOME

Pilot Kitchens: 10 Burbank Kitchens. 30% Less. Every One on Film.

Burbank Kitchen Remodeling Studio is building its portfolio in public. If your kitchen is one of the first 10, you pay 30% less than our regular price, and we film the job from the Tape Rehearsal to the Wrap Date. Same contract, same finish date, same rules.

10 of 10 Pilot Kitchens are open.

Small 1947 galley kitchen in Magnolia Park before the remodel, shot from the doorway

How Pilot Kitchens Work

In Burbank, a pilot is the first episode, made to show what the series will be. These 10 kitchens are our proof: real Burbank kitchens, filmed from the first strip of tape to the signed punch list.

You get the same kitchen, the same crew and the same contract as every other customer. The only difference is that we film it, and you pay 30% less for letting us.

What You Give

Your address is never published, only the neighborhood and the year the house was built. Faces appear only with a separate consent, and you can say no to that and still be a Pilot Kitchen.

  • Written permission to photograph and film the kitchen before, during and after the work, in a signed release kept with your contract.
  • A small time-lapse camera in the kitchen while the work is under way.
  • A yard sign until the Wrap Date.

What Stays the Same

Everything else on this site applies to a Pilot Kitchen unchanged:

  • The Wrap Date in your contract, with a $100 credit for each working day past it, up to 5% of the contract.
  • The Call Sheet by 6 pm every working day, and Quiet Hours you choose.
  • The Tape Rehearsal before anything is ordered.
  • The Old-House Price List, at its regular fixed prices.
  • The Last 5%, paid after you sign the punch list.
  • The 3-year written workmanship warranty.

Pilot Prices Next to Our Regular Prices

As of November 2026. The Pilot price is always 30% less than our regular price for the same scope.

Three things are not reduced: items on the Old-House Price List, changes you request on a signed change form, and charges set by Burbank Water and Power. The full breakdown of the sample kitchen is in our cost guide.

ScopeOur regular pricePilot Kitchen price (30% less)
Cabinet and counter update$26,000–$42,000$18,200–$29,400
Over-the-counter kitchen, small (up to 100 sq ft)$48,000–$64,000$33,600–$44,800
Over-the-counter kitchen, standard (101–200 sq ft)$62,000–$85,000$43,400–$59,500
Plan-check kitchen (a wall comes out)$85,000–$140,000$59,500–$98,000
Sample kitchen: 1947 galley, 99 sq ft$51,550$36,085

Who Qualifies

  • You own the house or condo and live in it.
  • The address is in Burbank or one of our service areas.
  • The project is a full kitchen: a same-layout remodel or one where a wall comes out. A cabinet and counter update alone qualifies only by exception, so ask.
  • The start date fits the pilot schedule, which your project lead confirms at the Schedule Visit.

The Rules of the Offer

The count is real. "10 of 10 open" changes the day a Pilot contract is signed, and when the tenth is signed, the offer comes off the site that day.

The 30% is for the filming permission, nothing else. It is never tied to a review: Pilot homeowners are asked for a review like every other customer, with nothing offered in return.

Pilot Kitchen Questions

Why do Pilot Kitchens cost 30% less?

Because you let us film your kitchen from start to finish, and those films become the proof we show future customers. The 30% is our side of that trade, and it is the only price reduction we offer.

What exactly do you film?

The kitchen before work starts, a time-lapse of the work, the Tape Rehearsal, Box Day and the finished room at the Wrap Walk. People appear only with their separate consent, and we never film the rest of the house.

Will my address appear online?

No. Films and photos name only the neighborhood and the year the house was built, such as "Magnolia Park, 1947." The yard sign stays only until the Wrap Date.

Do I have to leave a review?

No. The Pilot price is for the filming permission only. We ask every customer for a review the same way, and nothing is offered for one.

Can a kitchen where a wall comes out be a Pilot Kitchen?

Yes. A plan-check kitchen qualifies, at $59,500–$98,000 against our regular $85,000–$140,000, and it often makes the strongest film. The Wrap Date is counted from the day the city approves the plans.

What happens when all 10 are taken?

The offer comes off the site the same day, and our regular prices apply. Everything else, from the Wrap Date to the warranty, stays exactly the same.

Price ranges are typical for our projects in Burbank as of November 2026 and are not a quote. Your price depends on the size, layout, materials and condition of your kitchen and is set in a written fixed-price proposal after a visit. The Pilot price is 30% less than our regular price for the same scope and applies to the first 10 signed Pilot contracts only.

See If Your Kitchen Can Be a Pilot Kitchen

Book a free 60-minute Schedule Visit and tick the filming box on the form. Within 3 business days you get your fixed price at the Pilot rate, next to our regular price, with your Wrap Date. Call (909) 639-6347 or send the form.

  • The finish date is written into your contract
  • Tomorrow's plan by text by 6 pm, every working day
  • You walk the layout in tape before anything is ordered
  • Fixed prices for old-house surprises, before demolition
  • You pick Quiet Hours for your calls
  • The last 5% is paid after you sign the punch list
Get your price and your Wrap Date

A 60-minute Schedule Visit at your house. Your fixed-price proposal arrives within 3 business days.

(Within 3 months · 3–6 months · 6–12 months · Just planning)
(Layout · Cabinets · Counters · Everything)
(Weekday mornings · Lunch · After 6 pm · Saturday)

By submitting this form, you agree that Burbank Kitchen Remodeling Studio may contact you by phone, text and email about your request, including with automated technology. Consent is not a condition of purchase. Message and data rates may apply. Reply STOP to opt out.