The old kitchen comes out down to the framing where needed, and the plumbing and wiring behind it are brought to current code. Then the new kitchen goes in, in order: rough plumbing and electrical, inspections, drywall and paint, cabinets, countertops and backsplash, then lighting, fixtures and the final city inspection.
Your price includes the City of Burbank permit fees, the asbestos survey required before demolition, the drawings the city needs, protection, the dust wall, demolition and haul-off. Appliances are separate: you buy them, or we buy them at cost.
As of November 2026, a same-layout kitchen up to 100 sq ft runs $48,000–$64,000 and 28–34 working days on site, and a kitchen of 101–200 sq ft runs $62,000–$85,000 and 32–40 working days. The line-by-line breakdown is in our Burbank kitchen remodel cost guide.