01
Result A: No Permit for Finish Work
Painting, tiling and new countertops alone are on Burbank's exempt list. The work must still meet the building code, because an exemption does not authorize work that breaks it.
Once a sink, faucet, outlet or light fixture is replaced or moved, the job needs a trade permit. For counters only, see kitchen countertops.
02
Result B: Tier 1, Over the Counter
A kitchen remodel with no interior wall demolition is a Tier 1 simple permit: no plan check, generally issued over the counter. The city generally asks for a basic before-and-after floor plan, and electrical, plumbing and mechanical permits are filed with the same job.
If the panel or service is upgraded, the permit is still Tier 1, but Burbank Water and Power must first visit to spot the new meter location. That visit is scheduled by BWP's Electrical Service Planning, and its date goes into your Wrap Date.
As of November 2026, our Tier 1 kitchens run $48,000–$64,000 up to 100 sq ft and $62,000–$85,000 for 101–200 sq ft, with 28–40 working days on site. See full kitchen remodeling and small kitchen remodeling.
45–60
Result C: Plan Check
Once an interior wall comes out, the kitchen falls outside Tier 1 and goes to plan check. The application goes to Building & Safety by email, the Building Division replies within 3 to 7 business days with an invitation to submit through ProjectDox, and Planning screens the plans for zoning in the first 48–72 hours of review.
The city publishes no fixed turnaround for residential plan check, and says it varies with the complexity of the submittal. That is why our Wrap Date for a plan-check kitchen is set after approval, and the 45–60 working days on site are counted from that day.
As of November 2026, our plan-check kitchens run $85,000–$140,000, including the drawings and a beam engineered for a load-bearing wall. See kitchen layout changes.