HOME / SERVICE AREAS

Kitchen Remodeling in Studio City, CA

Burbank Kitchen Remodeling Studio provides kitchen remodeling in Studio City, CA, and has finished 180+ kitchens since 2013. We plan and build Studio City kitchens from layout to lighting, often opening a closed 1970s plan, and the finish date is written into your contract. The work covers open-concept remodels with wall removal, custom cabinets, quartz and quartzite countertops, and gas-to-induction conversions.

Remodeled kitchen in the style of a typical Studio City, CA, house

Kitchen Remodeling in Studio City

Doorway sealed with a zip wall dust barrier during a kitchen remodel, a laptop on the dining table beyond

We work across Studio City's 91604 ZIP code, on the hillside streets south of Ventura Boulevard and the flat blocks to the north. The median home here was built in 1972 (Census ACS 2020–2024), so many kitchens are closed rooms from that decade, ready for a new layout.

Hillside jobs need their own planning: narrow streets, limited parking and long carries from the truck to the kitchen. We set delivery days and parking at the first visit, and your neighbors see a clear driveway every evening.

As a City of Los Angeles neighborhood, Studio City gets its kitchen permits from LADBS, and plan-check projects are filed through ePlanLA. Any panel or meter change is coordinated with LADWP, and those dates feed into the Wrap Date.

Types of Kitchen Remodeling Available in Studio City

Open-Concept Remodel and Wall Removal

Removing the wall between kitchen and family room opens up a 1970s plan. A load-bearing wall comes out on an engineered LVL beam after LADBS plan check, and the 45–60 working days on site are counted from the approval; see kitchen layout changes.

Custom Cabinets

Custom boxes earn their cost in rooms with vaulted ceilings, angled walls or a long island run. We install custom and semi-custom cabinets, face-frame or frameless, and every box is checked against the order on Box Day.

Quartz and Quartzite Countertops

Installed in Los Angeles, quartz runs $65–$120 per sq ft and quartzite $75–$130 (Slabwise, 2025–2026). Slabs are templated once the base cabinets are level, and the install day is named on your Call Sheet in advance.

Gas-to-Induction Conversion

Switching to induction starts with the panel, since the range needs its own 240-volt, 40–50 amp circuit. We look at capacity at the visit, and if an upgrade is needed, it is scheduled with LADWP and shown as its own line in the proposal.

Why Choose Us in Studio City

Remodeled galley kitchen in a 1940s Burbank house with shaker cabinets and a window over the sink

Our owner, Mark Whitfield, brings 28 years in the trade, and designer Susan Pratt brings 18. The Studio has completed 180+ kitchens since 2013 and takes on no other rooms.

We plan Studio City kitchens around the street as well as the room: hillside access, parking, and LADBS plan check when a wall comes out. Those steps are in the schedule before your Wrap Date is set.

Reach out and a project lead texts you within 2 business hours to book the visit. It is free and takes 60 minutes, and within 3 business days you receive your price, Wrap Date and Old-House Price List on one page.

You walk the new layout in tape at full size before anything is purchased, and tomorrow's plan lands on your phone by 6 pm each working day. Finishing past the Wrap Date costs us $100 per working day, up to 5% of the contract; only signed changes, inspection scheduling and listed old-house items can move it.

We also provide kitchen remodeling in La Cañada Flintridge.

Studio City Kitchen Remodeling Questions

How much does a kitchen remodel cost in Studio City?

As of November 2026, a same-layout full remodel with us runs $48,000–$85,000, and a kitchen where a wall comes out runs $85,000–$140,000. Custom cabinets and natural stone move a kitchen toward the upper end of each range, and LADBS permit fees are in every fixed price.

Do I need plan check to open my kitchen in Studio City?

Usually, when a wall comes out: removing structure takes the project through LADBS plan check before the permit is issued. We prepare the drawings and the beam calculations, and LADBS makes the final decision.

Can you work on a hillside lot with no parking?

Yes. We plan delivery days, the dumpster or haul-off and crew parking at the first visit, and each one appears on your Call Sheet the evening before.

How long does a kitchen remodel take?

Keeping the layout, plan for 28–40 working days of work on site. Taking out a wall adds structure and city review, so the 45–60 working days start only after LADBS signs off on the plans.

Price ranges are typical for our projects as of November 2026 and are not a quote. Your price depends on the size, layout, materials and condition of your kitchen and is set in a written fixed-price proposal after a visit.

Book Your Studio City Kitchen Visit

Planning a kitchen remodel in Studio City? Book a free 60-minute Schedule Visit, and within 3 business days you get your fixed price and your Wrap Date. Call (909) 639-6347 or send the form.

  • The finish date is written into your contract
  • Tomorrow's plan by text by 6 pm, every working day
  • You walk the layout in tape before anything is ordered
  • Fixed prices for old-house surprises, before demolition
  • You pick Quiet Hours for your calls
  • The last 5% is paid after you sign the punch list
Get your price and your Wrap Date

A 60-minute Schedule Visit at your house. Your fixed-price proposal arrives within 3 business days.

(Within 3 months · 3–6 months · 6–12 months · Just planning)
(Layout · Cabinets · Counters · Everything)
(Weekday mornings · Lunch · After 6 pm · Saturday)

By submitting this form, you agree that Burbank Kitchen Remodeling Studio may contact you by phone, text and email about your request, including with automated technology. Consent is not a condition of purchase. Message and data rates may apply. Reply STOP to opt out.