Cabinet work starts with the layout: every box, filler and appliance opening is drawn to your room, then taped at full size on your floor and walls. Once you sign, the order is placed, and its confirmed ship date goes into your Wrap Date.
Installation means leveling base cabinets on floors that are rarely flat, scribing fillers to walls that are rarely square, and fastening wall cabinets through their back rails into studs. Doors and drawers are adjusted, hardware goes on, and the base run is ready for the countertop template.
Cabinets are the largest line in most kitchens and the longest lead time. In Los Angeles a semi-custom set typically runs $10,000–$20,000 and custom starts around $25,000 (GreatBuildz, November 2026), and our cabinet and counter update runs $26,000–$42,000 and 10–15 working days as of November 2026.