HOME / SERVICE AREAS

Kitchen Remodeling in North Hollywood, CA

Burbank Kitchen Remodeling Studio provides kitchen remodeling in North Hollywood, CA, and has finished 180+ kitchens since 2013. We remodel North Hollywood kitchens in single-family houses, condos and rental units, and every contract carries the date the kitchen will be finished. The work covers full remodels, condo and townhome kitchens, rental unit kitchens and gas-to-induction conversions.

Remodeled kitchen in the style of a typical North Hollywood, CA, house

Kitchen Remodeling in North Hollywood

Doorway sealed with a zip wall dust barrier during a kitchen remodel, a laptop on the dining table beyond

North Hollywood has two kinds of kitchens. On the single-family streets of 91605 and 91606, the median house dates from 1962–1964, with a closed kitchen and wiring from that era; in 91601, most homes are condos and apartments built around 1979 (Census ACS 2020–2024).

Because North Hollywood belongs to the City of Los Angeles, LADBS issues the kitchen permit: express permits through PermitLA, plan-check jobs through ePlanLA. We draw the plans and file them for you.

Panel and meter work is coordinated with LADWP, the city's utility. Its scheduling date goes into your Wrap Date, so a utility appointment never shows up as a surprise in week three.

Types of Kitchen Remodeling Available in North Hollywood

Full Remodel of a 1960s Kitchen

A 1960s North Hollywood kitchen usually gets new cabinets, counters and flooring, plus new circuits back to the panel to meet the 2025 California Electrical Code. As of November 2026, a same-layout full remodel runs $48,000–$85,000 and 28–40 working days on site.

Condo and Townhome Kitchens

North Hollywood condo boards usually want to see drawings, work hours, elevator reservations and how shared walls will be protected. We put that package together, and the crew keeps to the building's hours.

Rental Unit Kitchens

For a landlord, the goal is a kitchen that holds up to years of tenants and is ready on a set date. A cabinet and counter update runs $26,000–$42,000 and 10–15 working days, with quartz counters, porcelain tile and soft-close hardware.

Gas-to-Induction Conversion

Most induction ranges need a dedicated 240-volt circuit of 40–50 amps, so the switch starts at your panel. We check its capacity at the visit and coordinate any upgrade with LADWP; see induction conversion.

Why Choose Us in North Hollywood

Remodeled galley kitchen in a 1940s Burbank house with shaker cabinets and a window over the sink

Since 2013 we have finished 180+ kitchens, and owner Mark Whitfield has 28 years in the trade. That means one kind of job done many times over, not a general contractor fitting a kitchen between other projects.

We know the North Hollywood mix: HOA packages for condo boards, tenant schedules for duplex owners, and 1960s wiring in the single-family houses. Each is planned and priced before the first day on site.

Call or send the form, and your project lead answers by text within 2 business hours with two times for the free Schedule Visit. The visit runs 60 minutes, and the page with your price, Wrap Date and Old-House Price List follows within 3 business days.

Nothing is ordered until you have walked the taped layout on your own floor. Every working evening by 6 pm the Call Sheet names tomorrow's crew, and your last 5% stays with you until the punch list is signed.

We also provide kitchen remodeling in Toluca Lake.

North Hollywood Kitchen Remodeling Questions

How much does a kitchen remodel cost in North Hollywood?

It depends on the scope and the kind of home. As of November 2026, an update of cabinets and counters in a condo or rental unit runs $26,000–$42,000 with us, a house kitchen remodeled in its current layout $48,000–$85,000, and one with a wall removed $85,000–$140,000, permit fees and asbestos survey included.

Does North Hollywood use LADBS for kitchen permits?

Yes. As a City of Los Angeles neighborhood, North Hollywood falls under LADBS for building permits. We file as your licensed contractor, and LADBS decides what your project requires.

Can you remodel a rental unit kitchen between tenants?

Yes, and the Wrap Date is the reason it works. You know the finish date before the old kitchen comes out, so you can set the next lease start with it in writing.

How long does a kitchen remodel take?

Plan on 10–15 working days on site for new cabinets and counters, and 28–40 for a house kitchen redone in its current layout. If a wall comes out, the 45–60 working days start once LADBS has approved the plans.

Price ranges are typical for our projects as of November 2026 and are not a quote. Your price depends on the size, layout, materials and condition of your kitchen and is set in a written fixed-price proposal after a visit.

Book Your North Hollywood Kitchen Visit

Own a North Hollywood house, condo or rental? Book a free 60-minute Schedule Visit, and you get the fixed price and Wrap Date within 3 business days. Call (909) 639-6347 or send the form.

  • The finish date is written into your contract
  • Tomorrow's plan by text by 6 pm, every working day
  • You walk the layout in tape before anything is ordered
  • Fixed prices for old-house surprises, before demolition
  • You pick Quiet Hours for your calls
  • The last 5% is paid after you sign the punch list
Get your price and your Wrap Date

A 60-minute Schedule Visit at your house. Your fixed-price proposal arrives within 3 business days.

(Within 3 months · 3–6 months · 6–12 months · Just planning)
(Layout · Cabinets · Counters · Everything)
(Weekday mornings · Lunch · After 6 pm · Saturday)

By submitting this form, you agree that Burbank Kitchen Remodeling Studio may contact you by phone, text and email about your request, including with automated technology. Consent is not a condition of purchase. Message and data rates may apply. Reply STOP to opt out.